Work package screening

The missing stamp is always on page 145.

Drop in the scanned work package. A minute or two later you get a list of everything unsigned, open, mismatched or out of order, with page numbers so you can go straight to it.

TASK CARDSAMPLE · FICTIONAL DATAA/C ZZ-TST MSN 9999 WO 24-0917 ATA 32-31MLG RETRACTION ACTUATOR – REMOVE / INSTALLSTEPACTIONACCOMP. BYINSP. BY1Remove actuator IAW AMM 32-31-052Install new actuator. Torque IAW AMM3Gear swing / ops test – satisfactoryQA-07COMPONENT CHANGEP/N FX-4410-2S/N OFF VC-29977S/N ON VC-30418RELEASE CERT: EASA FORM 1 · TRK 0932-17 · S/N VC-30481CARD CLOSED 14 MAR 2026 · PAGE 12 OF 40INSPECTEDQA · 07No sign-offS/N mismatch
Fig. 1 · Sample task card, fictional data
Early accessworkpack-auditor.com

We don’t keep your files. It’s a first pass, not a sign-off.

1.0 Sample report: What comes back

SampleThis is what a report looks like. The data here is made up.Showing 2 of 6 findings
Findings
06
Critical
04
Major
02
Minor
00
Pages verified
23/23
Matches the PDF’s 23 pages
CRITICALCC-0217PG 31

Installed S/N does not match the release certificate

EvidenceS/N ON recorded as VC-30418; EASA Form 1 block 10 shows VC-30481
CRITICALTC 27-51-04 step 6PG 12

Work step recorded as accomplished but not signed

EvidenceStep marked accomplished on the card; Accomp. by and Insp. by blocks both blank, with no signature or stamp

2.0 Built for: Who it’s for

  1. 2.1MRO qualityCatch it before you sign the CRS.
  2. 2.2CAMOsCheck the package before it goes into the records.
  3. 2.3LessorsKnow what you’re getting back before handover.
  4. 2.4Records consultantsGet through a package in an hour, not a week.
  5. 2.5Business aviationKeep the records clean for the next owner.
  6. 2.6Pre-buySee the gaps before you sign the purchase agreement.

3.0 Checks: What it looks for

  1. 3.1Sign-offsWork written up with no signature, stamp or licence number. Typed names don’t count.
  2. 3.2Open itemsCards left open, deferrals with no reference, and cards the CRS says are done when they aren’t.
  3. 3.3ComponentsSerials on and off checked against the release certificate, character by character. Transposed digits included.
  4. 3.4DatesInspections signed before the work, tests before the part went in.
  5. 3.5ADs and SBsMissing revisions, no method of compliance, recurring ADs with no next-due.

4.0 Data: Your files

  1. 4.1Nothing kept. The PDF is read, checked and dropped. No database, no copies.
  2. 4.2Read by Claude over an encrypted connection, under Anthropic’s commercial API terms. Not used to train models.
  3. 4.3It tells you where to look. The airworthiness call is still yours.